Gallery

John at Moog Components Group

Blacksburg

Tex installing a fan at Eastern Divide Brewery - Blacksburg

Freddie securing a conduit run at

MRSWA - Christiansburg

Nick wiring the keg cooler at Eastern Divide Brewery

The Brew Crew

Eastern Divide Brewery

Blacksburg

Nick working on the roof fan

of a restaurant - Blacksburg

Blacksburg Transit

LED upfit

Residential EV Charger

50 kW generator installation

John in the bucket truck at Red Robin - Christiansburg

Nick working on pole lights

 NRCC - Dublin, VA

VT Hangar - huge bi-fold doors allow entry

to short-haul commercial and private aircraft - Blacksburg

These conduit runs to brew tanks at Eastern Divide Brewery are all about precision!

Machinist - Riner, VA

Sub-panel installation

at a Machinist Shop

Riner, VA

Colorful exhaust hood control panel at Eastern Divide Brewery - Blacksburg

Fan and Chandelier Chain Installation

 Blacksburg

Elevated conduit runs at

Montgomery Regional Solid

Waste Authority

 John taking a break from changing bulbs on 22 foot ceilings!

Blacksburg Baptist Church

Chris using a trencher to insert conduit

into the ground for a dock circuit

Claytor Lake

John and Doug installing a meterbase

Blacksburg